Thursday was very, very quiet at our house.
They were supposed to set up the pump and start pulling out groundwater, but nobody showed up. At least that's what the PB thought was supposed to happen.
So the only news today is:
- Affirmed that no permit will be required for the cistern (although now that the framing is in, I have no idea how that's going to get excavated, because it's beyond the pool)
- Large samples of Shellock "Tan" and "Cafe" (the new colors) arrived at the showroom, to help facilitate choosing tile
- Asked for a sample of a Mastertile called "Desert Canyon Rainbow Green" (which doesn't sound very blue, does it?) because the picture in the catalog looks interesting, and that was the only sample that the designer couldn't find in her showroom (which is pretty impressive).
- Started a blog
Digging is scheduled for Friday, but I have to chaperone a high school field trip and I'll probably miss a lot of it. Bummer.
No comments:
Post a Comment