This example to the right is the downspout from the corner of the lanai, with Sophie posing inside the corner.
All these drain lines had to be routed on a not-to-interfere basis with the pool plumbing and (hopefully) before the masons arrived to pour the footers for the decking, which would be difficult to work around.
The picture below shows how much of the hole that the excavator dug for us. We had planned for him to dig the full size for us, but the rumor is that the contractor was worried about a cave-in and stopped him at maybe 1/3 of the size we need. At this point, we're not sure how we're going to get the rest of this dug out. Did I mention that the cistern is over 1100 gallons?